Big day at work here at El Rancho Jimbo with some good progress made on the Enrichment Aviary Project. This project is in preparation for a presentation that I will be delivering at the Parrots 2010 Convention in Brisbane on July 3-4. That means there's only 5 weeks left for me to get these darn enclosures finished - Agghh!!!
The positive news is that the painting is complete and today we were able to bolt together the three enclosure frames to the central walkway frame. The next set of `build' stages will involve securing the corner footings, putting on the roof sheeting, and hanging the doors. I'm confident that I can pull that off in a weekend and then it's on to the `good' stuff - landscaping, perching and fit out. With just 5 weeks to go I'm going to post about the progress weekly so you guys will see if I get it done in time! Otherwise... It'll be a short lecture at Parrots 2010 :-) Check out some updated images below.
Front two enclosures - each will be home to our Amazon Parrots. We have used solid colorbond 1.6mm sheets as wall partitions for the back wall and a 1/3 screen along the walkway.
A view looking into the walkway. The walkway is actually a separate frame that the three enclosures are bolted onto. It's part of a design method I came up with when we built the original three enclosures and gives a bit more flexibility down the track if we decide to change the layout of the complexes.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.